Environment Agency - Chain of Custody Certified Sites
The table below details the Birse Civils’ sites that are currently engaged in works for the Environment Agency, where our Timber Chain of Custody procedures are required to operate. These procedures are certified under the FSC and PEFC registration schemes.
The table also provides information as to the audit status of each site. These
audits ensure that the CoC is being operated effectively and in accordance with
our timber procurement policies.
This process is agreed and monitored by our auditors BM Trada.
|
Project
Name |
Contract No |
Project Description |
Contract
Start
Date |
Contract
Finish
Date |
BM Trada
Audit |
|
Denver Little Eyes |
C2345 |
Stop log and lock gate work |
Mar-10 |
Oct-10 |
TBC |
|
Dymchurch |
C2355 |
Supply and storage of sheet piles, supply of moulds for precast units, supply
of vacuum lifting apparatus, supply of temporary edge protection gabion baskets,
manufacture of 280No.precast units |
Mar-08 |
Jul-11 |
TBC |
|
Gainsborough
Frontages
Phase 2 |
C2404 |
Installation of single or double row of ground anchors through existing river
walls
Installation of structural steel waling beams Tidal working for low level anchors Interface with public / private landowners for access Monitoring of existing structures during works Protection and / or removal of high quality landscaped areas and private gardens in order to gain access Protection of trees subject to TPO’s |
Nov-08 |
Jul-10 |
TBC |
|
Stallingborough
Sea Defences |
C2418 |
Improvement works to the existing open stane asphalt revetment at Stallinborough |
Apr-09 |
Oct-09 |
TBC |
|
Penrith |
C2423 |
Site Clearance: Felling of a number of trees and low lying shrub clearance in
preparation for future works |
Mar-10 |
TBC |
TBC |
|
East Holton |
C2429 |
Improvement works to the existing tidal defences at Halton Marshes, North Lincolnshire |
Feb-09 |
Mar-10 |
TBC |
|
Swinefleet |
C2478 |
Flood defence works consisting of earth bund embankment and piling. Toe piling
in river to be carried out from barges. |
Jun-09 |
May-10 |
TBC |
|
Dartford Creek 2 |
C2509 |
Design, manufacture, testing, installation and commissioning of the replacement
mechanical and hydraulic drive, electrical and control systems, design and implementation
of non-priority H&S improvements and recoating of the barrier gates for the
Dartford Creek tidal barrier. |
Feb-10 |
Aug-10 |
TBC |
|
Gunness
Flood Bank
Improvement |
C2520 |
Installation of 3.6km of 2.5m long plastic piles on the existing flood bank near
Gunness. Works are adjacent to the River Trent which has tidal flows. Landscaping
works upon completion of piling. |
Dec-09 |
Jun-10 |
TBC |
|
Newmans Sluice
Gates |
C2523 |
The replacement of 4 power operated vertical lift gates at Newmans Sluice. Associated
remediation of channel bed scour downstream of the sluice, improvements to the
adjacent access track and offsite environmental enhancement works. |
Mar-10 |
Oct-10 |
TBC |
|
Morpeth Dock
Pumping Station |
C2526 |
Demolition of dock building and infilling of dock. |
Mar-10 |
Mar-10 |
TBC |
|
Purls Bridge
emergency repairs |
C2533 |
Emergency repairs to failed section of existing river bank including earthworks,
sheet piling and capping beam works |
Feb-10 |
May-10 |
TBC |
|
Donna Nook
Managed
Realignment |
C2541 |
Flood defence works consisting of earth bund embankment and piling. Toe piling
in river to be carried out from barges. |
Apr-10 |
Jun -11 |
TBC |
|
BAP Habitat
(Beam Park) |
C2543 |
Earth movement and bank shaping of the River Beam and Wantz Stream with vegetation creation and enhancement to improve the park environment |
Jun-10 |
Jun-10 |
TBC |
|
Tilbury Flood
Alleviation |
C2548 |
The raising of the crest levels of the existing earth embankments, ditch realignment,
concrete wall. |
Apr-10 |
Jul-10 |
TBC |
| Dog in a Doublet |
C2551 |
Refurbishment of existing sluice gate structure including replacement of motors
and ropes to gates and control systems, installation of CCTV, navigation lights,
cable ducts and boxes, cleaning and repainting of gates and support structure,
removal, refurbishment and reinstallation of gearboxes and concrete repairs to
structure. Access road, crane pad, earthworks and fencing. |
Apr-09 |
Jan-11 |
TBC |
|
Lincshore |
C2552 |
Dredging and beach recharge on an annual basis. |
May-10 |
Dec-10 |
TBC |
|
Arklyn Flood
Alleviation |
C2554 |
River bank enhancements and flood alleviation improvements consisting of sheet
piles, precast concrete walls and in-situ concrete walls - all to maintain and
improve flood protection for private properties |
Apr-11 |
Dec-11 |
TBC |
|
Hayling Islands
& West Wittering |
C2557 |
Design, value engineering and buildability advice during ECI phase. |
Oct-09 |
Jul-10 |
TBC |
|
Soham Lode
Seepage Remedial
Works |
C2571 |
Liner to existing watercourse |
Sep-10 |
Jan-11 |
TBC |
|
Clwyd Embankment |
C2573 |
Raising of existing earth flood prevention embankments on both banks of River Clwyd, existing cycleway, existing slipways and concrete retaining walls to new levels. |
Jul-10 |
Nov-10 |
TBC |
| Brough FAS |
C2574 |
Extension of an existing sheet piled wall by approximately 500m along the landward
crest of an existing flood embankment. Construction of approximately 1500m of
3.5m high earth embankment. Outfall improvements. |
Jul-10 |
Feb-11 |
TBC |
|
Western Drain FAS |
C2579 |
Extension of an existing sheet piled wall by approximately 500m along the landward crest of an existing flood embankment. Construction of approximately 1500m of 3.5m high earth embankment. Outfall improvements. |
Jul-10 |
Dec-10 |
TBC |
|
National Framework
contractors 2 |
C2586 |
Installation of 2No 600mm dia river outfall drains between drainage ditches and
the River Severn. |
Aug-10 |
Nov-10 |
TBC |
|
Wicken Fen WLMP |
C2587 |
Supply and installation of a Wind Pump Tower, two sump chambers to the north and south of Wicken Lode, interconnecting concrete pipe and water supply ditch. |
Aug-10 |
Nov-10 |
TBC |
|
Lincshore Beach
Nourishment |
C2592 |
Beach nourishment and other coastal works at locations between Mabelthorpe and
Skegness. |
Oct-10 |
Oct-14 |
TBC |
|
Oxford STM
Phase 2 |
C2599 |
Hinskey dredging. Silt removal and in-channel works. Bank cut and tree clearance.
Seacourt and Bulstake Stream culverts. Four small culvert units installed in existing
embankment area. |
Oct-10 |
Apr-10 |
TBC |
|
Fiskerton Sluice
Refurbishment |
C2602 |
Construction of a new downstream cut off and filling of a large void under the downstream apron. Removal and repainting of gates. New tracks and seals. Repair of piers and wing walls. New access stairs and decking. New actuators and electrical system. New bulkhead gates. Installation of a fish pass. |
Oct-10 |
Feb-11 |
TBC
|
|
Cone Pill, Lydney |
C2586 |
Installation of river outfall drains between drainage ditches and River Severn |
Aug-10 |
Oct-10 |
TBC |
|
Newport FAS |
C2512 |
Replace existing flood wall on the River Usk near Newport |
Jan-11 |
Mar-11 |
TBC |
|
Burringham Emergency Slip Repairs |
C2621 |
Emergency repairs to slipway on River Trent near Burringham in Lincolnshire |
Jan-11 |
Mar-11 |
TBC |
|
Redcar |
C2622 |
Flood alleviation and landscape enhancement works in Redcar |
Jan-11 |
Jan-13 |
TBC |
|
Prestbury FAS |
C2625 |
Installation of flood relief culverts and bypass ditches near Cheltenham |
Feb-11 |
Jun-11 |
TBC |
|
Afon Ganol |
C2630 |
Replacement of tidal outfall structures |
Feb-11 |
Mar-11 |
TBC |
|
Thetford Sluices |
C2672 |
Replacement of M&E sluice equipment |
Jul-11 |
Sept-11 |
TBC |
|
Thames Tidal Frontages |
C2644 |
Flood defence works at various Thames tidal locations |
Mar-11 |
Dec-12 |
TBC |
|
Reconditioning local levy and associated works |
C2689 |
Repair and replacement of local levy, water resources and other works at various
locations in the Eastern region |
Aug-11 |
Mar-12 |
TBC |
Our public product list is as presented below; our ‘product’ does not fit within the categories presented in the FSC standard addendums:
- Addendum to FSC Standard FSC-STD-40-004 – FSC Product Classification FSC-STD-40-004a (Version 1-0) EN
- Addendum to FSC Standard FSC-STD-40-004 – FSC Species Terminology FSC-STD-40-004b (Version 1-0) EN
In order to comply as best as possible with these FSC requirements our ‘project
type’ presented can be considered our ‘product categorisation’ that is publicly
available in line with the standard addendums mentioned above.
Last updated: December 2010